Thursday, June 2, 2011

Out of the Frying Pan and into the Fire

Tifton, Georgia 6-1-2011

Crazy or not, we left Orange Park at 5:05 PM.  I wanted to get away from the house because of OTLTA (one thing leads to another).  You know how it goes.  I wanted to water the plants one last time, but I should probably trim them also, but that means digging out the electric hedge trimmer, which means I probably ought to tidy up the shelves because Ron will see them….. Whoa! EJ also had things left undone. Finish cleaning the house/floors so it will be nice for our return, finish the pillows for the RV, etc, etc. Let’s nip that in the bud right now.  Time to go!

P1040471

We drove US82 along the edge of the Okefenokee Swamp and saw the devastation caused by recent fires.  In fact you could still see smoke rising from hotspots here and there. All the underbrush is gone but some of the taller trees still have green leaves/needles at their very tops.

image

We wanted to make it to Cordele, Georgia, but we started running out of daylight.  As it was, we rolled into The Pines Campground in Tifton at 8:25 PM just as the sun was disappearing over the horizon. The high was 102 in Tifton and only 90 in Orange Park, Fl. Hmmm.  Temperature-wise the Frying Pan wasn’t so bad.

Monday, May 30, 2011

Departure – Imminent!

Any day now we’ll be leaving.  Big Guy is ready. The remodel is done. Tire pressure is good.  Oil levels are OK.  Plenty of coolant.  Fuel tanks full. Now all we have to do is load the RV and close up the house. 

Here are some  pictures before the remodel.

DSC_1811 DSC_1812 DSC_1813 DSC_1815 DSC_1828

And here are some pictures after the remodel.P1040461P1040467

P1040458 P1040459   P1040470

The new layout has much more room even with the slide retracted.  We can entertain 6, have four for dinner, but it only sleeps two, just the way we like it.

Here is the anticipated route.  This is just an outline and will be modified on a random basis.  We’re easily side tracked.image

Friday, May 20, 2011

Now you see it, then you don’t!

In our last post we mentioned getting rid of the old crt TV set was the reason for Big Guys’ remodel.  It bugged me that the TV was mounted above the dashboard.  The only chair that faced that way was the recliner which then begged the question “who gets the recliner?”.  The couch was pointed at a 90 degree angle to the TV which meant severe neck cramps if you wanted to watch TV.  The other thing that bugged me about the old TV was that it hung down from the ceiling making a convenient target for my head

So, being an engineer, I wanted a more elegant solution.  Now you see it…P1040448Going, going.. 

P1040449

Now you don’t….

P1040443

That was fun!

We got started on the doors and drawer fronts today.  A couple more days and they should be ready to install.  Then we can get serious about loading our stuff and hitting the trail.

Wednesday, May 18, 2011

Schedule…schmedule.

We haven’t even left on our summer trip yet and we’ve already blown the schedule.  “Big Guy” (so named because in comparison to our previous motorhome, “Roadie”, it is a lot bigger) has been having a major refit to its interior.  It’s hard to say what precipitated the redo, but I think it started with replacing to the old crt TV with a LED flat screen and morphed into a new reclining loveseat, new flooring, and new cabinetry.  That coupled with my inability to predict how long any particular phase will take has made a  mockery of our initial departure date.  For our friends and neighbors that carve departure and arrival dates in stone, this is driving them nuts.  “You said you were leaving on the 15th.  Why are you still here?”

P1040431P1040427

P1040428P1040430

The counter top should be installed tomorrow.  I still have to figure out how to attach the floating counter piece to the hidden TV.  Then it’ll be on to building drawer fronts and cabinet doors.

Along with all this, we’re trying to get wills and Durable Power of Attorneys written in case things go awry this summer.  We’ve put his off for years now, but it’s time to put it to rest.  It’s easy to say “Hey we’ll be dead, it won’t be our problem!” but that’s not fair to the friends and family members that will survive us.  This, too, should be wrapped up in the next few days.

As for the schedule, who knows?  Maybe next week sometime we’ll actually be on the road again.

Sunday, October 3, 2010

Texas Bound Shocks August 3, 2010

The journey to San Angelo has not been without moments of exictment surrounded by hours of uneventful driving.

The first was near Robertsdale, Alabama when we pulled in to buy diesel and had to pay $3.04 a gallon. Quite a shock when we had been paying $2.70 to $2.84 a gallon.

The second was in Baton Rouge, Louisiana. Frank was getting tired, "Big Guy" needed a fuel stop and we needed to get up and stretch some to get the kinks out. So while we were in that really relaxed state looking for a filling station there was a big "WHAM". We had just been clobbered by a Fed EX truck. Actually he ran into the drivers side mirror. EJ and I were sitting at a traffic light minding our own business when the incident occurred. Because of the shock of having our peaceful reverie interrupted, the crash sounded much worse than it really was. Turns out there was no damage, but the Fed Ex guy never apologized. He swore that he never left his lane. Funny how a 24,00 pound motorhome can be at a standstill, jump in front of a Fed Ex truck, get hit, then jump back into it's own lane and nobody notices. Needless to say, with all that adrenalin pumping,Frank was no longer tired.

The further west we drove that hotter it got. We were seeing temps well into the 100's. Looks like that repaired generator is going to get a workout on this trip.

We arrived at Bill's(Frank's Dad) place about 5:45pm and Terry (Frank's brother), Joy, and Bill came out to see the RV. It was the first time they had seen it in person.

A Sad Texas Journey August 1, 2010

It's a sad trip we begin. Frank's mother passed away on July 19, 2010 and we are on our way to be with his Dad and prepare for the memorial service. Her health had been failing for the last several months partially brought on by a series of mini-strokes. She passed away in her sleep that night. The service is to be held August 5th so that gives 3 days to get to San Angelo and 1 day to prepare for the service. We have pictures to prepare, scrapbooks to assemble, and speeches to write. Even though we had been mentally preparing for this since May, you're still not prepared when it actually happens.

Monday, September 13, 2010

Big Guy Gets a Checkup - July 9 to 15 2010

Big Guy is due for a checkup.  Having just bought our motorhome in March of 2010 we had not had a chance to go over the mechanical systems like we wanted to. We knew the second owner had been good about annual oil changes and filters but we had no knowledge of how Big Guy had been treated by the first owner as there were no records available.

Frank wanted to take him to Gaffney, South Carolina as that is the source for Frieghtliner motorhome chassis which Big Guy has.  Briefly motorhome chassis consist of everything that makes the motorhome go and stop.  So appointments were made, budgets were established (more on that later), and packing was accomplished.

We left Orange Park on July 9 headed towards Blue Ridge, Georgia to see friends Jim and Shelley Ward and their new mountain cabin.  The Putnam's and the Ward's had consulted their respective calendars and determined that this one weekend was probebly the only weekend we would be able to get together until November or December.

Naturally the night before we left, Big Guy developed a problem.  The hydraulic system for the slides and stabilizer jacks decided to go on strike.  Frank worked on the problem until the wee hours of the morning with limited success.

We arrived in Blue Ridge late in the day because several stops were made in an attempt to get several rv dealers to work on the hydraulics.  Every where we stopped the service departments were full and they
couldn't take time to look at our problem.  Oh well, when we bought Big Guy we knew there would be times when we would have to spend a night or two with the slides in so we'd just deal with it.

We stayed at the Mineral Springs RV Park in Blue Ridge.  It was kinda rustic but it had all the amenities.  As we were setting up, Frank decided to take a chance and put the slides out.  By golly, they worked.  We called Jim and Shelley and invited them over to take a look at the new (to us) motorhome.



The next morning we got to see their new cabin and were we surprised. The "cabin" was huge and beautiful.  The deck space at the cabin was bigger than our condo in Orange Park. 


We spent the day exploring and enjoying the house.  They also took us on a tour of the Blue Ridge area and we also looked at RV Parks for future visits.  That evening we cooked out and enjoyed catching up since we hadn't seen each other in a long time.

The next morning we returned to Jim and Shelley's and had a great breakfast to prep us for the trip to Gaffney.


After breakfast we returned to the RV to get ready to get underway for South Carolina.  One of the last items is to retract the slides and guess what?  They chose this particular moment to go on strike again.  Knowing that this situation might arise, Frank had studied the manual and determined it was possible for two people to manually retract the slides.  After much head scratching and grunting we managed to get them back in and off we went.

Our course to Gaffney took us over some pretty twisty roads and we noticed the bedroom slide was working it's way out.  That's not a good thing to have happened when you're cruising down the road.  So we found a place to pull over where there was a car already parked and managed to push the slide back again.  Frank tweaked the hydraulic solenoid valves one more time and we crossed our fingers.

Due to all the delays, we arrived in Gaffney late and then ended up going to the wrong place.  We went to the Frieghtliner factory instead of the Service Center.  However the guard at the factory gate was used to this happening and had directions printed up to hand out for lost souls like us.  We arrived at the Service Center at about 6pm and there was only one space left in their campground.  It was #13.  Frank had read some forums that said arrive early or you may not get a spot.  We were lucky.

We were prepared for Big Guy being in the shop for all of Monday and part of Tuesday as we had enrolled in Camp Frieghtliner.  This was a 2 day class that taught you about your motorhome chassis.  It was very informative and fun.  We learned about things we didn't even know we had.  The cool thing about having service done here is that they come get your motorhome ar 8am in the morning and bring it it back by 5pm.

Part way through the second day, the service people told us they were going to need to keep Big Guy for a third day.  Turns out, the maintenance that had been previously preformed on Big Guy had been superficial at best.  Just like the generator, the diesel engine cooling system was a mess.  And the radiator was a mess, and they found the right front wheel hub was leaking which explained some funny odors we had been smelling.  The list goes on.  Needless to say our carefull budget planning was out the window.

We spent the third day that Big Guy was in the shop touring the Frieghtliner factory.  We got to go out on the shop floor and watch them building several motorhome chassis.  At their peak several years ago, they were building 150 motorhome chassis a month.  Now they are building about 9 a week.

We spent Wednesday night at the Frieghtliner Service Center and headed home to Orange Park on Thursday.  And believe it or not, Big Guy performed like a new motorhome.  The service was expensive, but it was complete and it was necessary.  We now feel confident that we are ready for the big summer trip.